KOPTERI bike build 2

 First mokup. Dont worry there is a new spring coming for the frontend.
Ei paha, ja uusi jousi on tulossa keulalle
 Planing the gastank, its an old moped tank......
Vanha Raisu tankki sopii kuin nenä päähän.
 Start of the tank.
Aloitin pohjasta.
 The lines of the top of the tank.
Hahamottelen tankkin muotoa.
 Top of the tank.
Tankin "kansi" työn alla.
 Top welded.
Kansi hitsattu kiinni.
 Now for the sides.
Kylkien vuoro.
 Taced in place.
Nestattu kiini.

 Ready now for the fasteners.
Enää kiinitys

KOPTERI Bike The Build

 The idea behind this projekt is to build a daily driver for Kopteri magazine.
The loolk of the bike will be a mix of old board trackers and modern parts, the most imoprtant part of this build is to get the bike to ride wery good and kick twinkie ass.......
 SnowFlake customs will have these leaf spring front ends ready for sale next fall after they have ben tested this summer.
Lehtijousi keulat tullossa myyntiin ensi syksyllä, testaus menossa kesäällä.
The frame is wery light. The engine will be a sportster engine. Snowflake Customs will have these frames available for special order.

Snowflake Custom Parts for Shovelhead

 This is just a sneak peak, more information to come.
Vähän ennako kuvia, lisää infoa tulossa.




The Blue bike

 Ok, this bike gets an EVO engine 4-speed tranny.... basic stuff
Evo kone 4 lovinen loota ja muuta perus kauraa...
 Nice building new stuff...
Kiva kuin on uutta.
Frame is powder coated, and started to rebuild the bike.
Runko maalattu, ja kasaus aloitettu.

Pics of the Pig

 Work in progress....
Hilja hyvää tulee......
 Inspiration...
Phase 3? Does any body know anything about this part?
Onko kellään mitään infoa tästä osasta....

Triple trees for the painter

 I started with watercut parts.
Aloitin vesileikatuista osista. 
 This is the top tripple tree that is being milled.
Ylä t-kappaleen arporaus.
 Lower tripple tree.
Alempi t-kappale.
 Closeup off milling.
Vähän lähempää....
 Have been milling for 8 hour about now......
Tässä kohtaa on mennyt 8 tuntia.......
 Lower tripple tree ready.
Alempi t-kappale valmis.
 Botht ready, this was about 9 hours of milling.
Valmiina tässä oli mennyt n 9 tuntia jyrsimistä.....
Work of art, a god front end for a softail with wery good brakes.
Siistit t-kappaleet ja toimiva keula softailille missä on hyvät jarrut.