SNOWFLAKE CUSTOMS

Sunday, March 13, 2011

WLA Frame fix

This is after welding.
Made a new seathindge for this bike.
Ready with the welding.
The other side of the neck after welding.

WLA Frame fix

Got his frame for repairs. The neck was badly cracked.
Much work on this frame,
and more work, ok this is an old frame so much history on it and bad welding....
Crack in the neck.
From the other side of the neck.

Frankies Shovel

Backfender for the bike
Moby Dick the gas tank......
The seat and battery/electric box
The frame ready for paint, I will get the bike back from paint in about 6-8 weeks.I will post more pics of the bike when I get it back from paint and start the final assembly

Frankies Shovel

The metall work on this bike is ready and it is going out for paint, here are the bars for the bike and some pics of making them.
Fitting them on the bike and measuring them for the owner of the bike so that he can ride it with comfort....



Thursday, March 3, 2011

Pop up

My friend Jeppe made this popup gascap.
In action.
One more to come for the oiltank.


Frankies bike

I had to make some modifications to the tank to fit all oillines, I bent a tube cut it in half and welded it on the tank cut the bottom out and wola I have room for ewerything!
Here is the hatch what you can open for installing the oil and fuel lines for the engine. I wanted the battery to fit here also but no cigars on that one fu*k.........
Starting on the seatpan. I think i will install the battery here.I have some industrial realy small batterys for this application have been trying them out on other projekts and they workt wery well on them.
Here is the Moby Dick tank in all ist glory, you can also see how the pipe continues on the fender.
I also made a new intake for this bike. This is an "bolt on" to the s&s intake still have a lot of polishing to do on it.

FL -57

Parts back from powder coating, this came out wery nice. I´m trying to get this bike to look old like the factory would have made the bike in the 50´s or 60´s well you get my point i hope.
I like this. Send me a mail snowflakecustoms@gmail.com if you want or need something for your bike done.

American sportbike

Ok, had this one out for a spin today +3C and a meter of snow but the bike worked like a dream.

Sunday, February 20, 2011

Metallwork

Some basic work that I do.

Possu the bike

Got the pipes ready for the pig. These are made out of old bends and swap meet finds.
No the usual setup.........

These will not hit the road when you turn.


I had to make a tail for the pig.

Frankies Bike

I have made some progress with this bike, here are some detail pics of what I have been making on it.
Braket for the clutch cable

Gasline inside the upper engine braket
Fender struts, and some detailing.
Top engine mount

Monday, February 7, 2011

Railing

Made a stainless railing for a small ship, here I still have some pollisnig to do on the railing.

FL-57

Testing it on the bike,looks ok. I think its ready for powdercoating.
Some cutting and grinding.

FL-57

Welded it in place.
Cut a plate to fit the new insert.
Then i grinded the welds.
I cut of the "ear" for the starter/solenod thing, made an insert of 1,5mm plate tigwelded it in place.
I welded the inner primary cover this weekend at a friend and started on the outer tin today.

Monday, January 31, 2011

Frame

Then the last tube. I dont use a pipebender I only use an accetylen oxygen torch for bending the pipes for this work. After this start welding. Remeber when fiting the tubes on the frame dont use any force to keep then in place or you will fu*k up the frame when you take it out of the frame jig.
Then center and level the second cast part to the first one. Then fit in the second back down tube. Then the top tubes just tac the tubes no coplete welding yet.

Started on the right down tube because it is in line with the rest of the frame tubes.


Closeup of the weld and how the cast part is cleaned befor the backtubes are welded in place.



The neck is centered in the jig and on the frame, and ready for welding.